Powerit Solutions

ABOUT US NEWSROOM CONTACT US BLOG      
Industrial & Commercial Energy Management Systems

Please take a moment to fill out the information below and we'll have a analyst calculate your potential savings and contact you soon.

 

Food & Beverage Processing

Savings Evaluation Questionnaire

You must javascript enabled to use this form


* Indicates a Required field

Company Information:
Company Name:*
Contact Name:*    
Title:
Email:*  
Phone:
Note: All information supplied is confidential and will be for Powerit Solutions' use only and will not be distributed outside of Powerit Solutions.

Utility/Load Information:
Name of Utility:
Number of billed meters:
Utility Rate Schedules (This information can be found on your utility bill.):
Please fax or email a utility bill from the past 12 months.
If you are unable to provide utility bills please provide the following:
January:
Total kWh: Peak kW: Estimated Monthly Demand Charges:
April:
Total kWh: Peak kW: Estimated Monthly Demand Charges:
July:
Total kWh: Peak kW: Estimated Monthly Demand Charges:
October:
Total kWh: Peak kW: Estimated Monthly Demand Charges:

Please provide electronic kW interval data for 1 month, 12 months is preferred.
Approximate refrigeration HP:
Do you currently have an energy management system?
Yes
No
If yes, please describe:


Please check all that apply regarding your facility:
Cold Storage (0° F or colder) Approx. Square/Cubic Footage:
Cold Storage (above freezing) Approx. Square/Cubic Footage:
Process Cooling (ex: product cooled from field to storage temperature)
Process Freezing (ex: belt freezer, spiral freezer, etc)
Other Process Loads (ex: tank cooling, hydro cooling, blast freezing, etc)
Central Refrigeration Control System

It is helpful for us to also evaluate a site map of your facility. We'll look for key installation locations such as furnace, power supplies, operator stations, network locations, etc. Please email or fax a single site map if possible.
Compressor Information:
Please complete the following table for each compressor in the facility.
Identifier
(Ex: Fan #1, Pump #2)
HP Each
(Ex: 500 HP)
Type
(Ex: Screw, Recip)
Evaporator Information:
Please complete the following table for each evaporator in the facility.
Identifier
(Ex: Evap #1, Evap #2)
Number of Fans
(Ex: 12 Fans)
HP Each
(Ex: 500 HP)
Fans VFD Controlled?
(Yes / No)
Process Line Information:
Please complete the following table for each process line in the facility.
Line Identifier
(Ex: Line #1, Line #2)
Type/Product
(Ex: 12 Fans)
# of Fans per Freezer
(Ex: Belt Freezer, Spiral Freezers)
HP Each
(Ex: 10 HP, 25 HP)
Dwell Time
(Ex: 15m, 30m)
VFD Controlled?
(Yes / No)