Powerit Solutions

ABOUT US NEWSROOM CONTACT US BLOG     Noesis Energy facebook twitter linkedIn    
   

Customer Testimonials

Food & Beverage

"I’m not easy to impress but this is one of the few times that I can honestly say the end result was greater than I anticipated."
Garth Ramseier, President, Anchor Warehouse Services

"We are not only satisfied, but also overwhelmingly thrilled with the product."
Lee Haskins, Director of Operations, Del Mar Food Products Corp.

"For the last three years, we’ve tried to participate in PG&E’s demand response programs manually, but we were totally unsuccessful. Powerit’s technology makes it easy."
Danny Vincent, Plant Manager, Guadalupe Cooling

"During the installation process there was absolutely no negative impact to production thanks to the wireless technology that was utilized."
Bert Pires, Director of Engineering, Amy’s Kitchen

Metals & Foundry

"The energy management system is a great tool. We have achieved the predicted savings and would definitely recommend it to others."
Dick Winsemius, Plant Engineering and Maintenance Manager, Cannon-Muskegon Corporation

"We are very satisfied. The system has fulfilled all of our expectations as well as the estimated savings."
Mark Regus, Plant Manager, Pacific Alloy

"Powerit Solutions provided our business with a system that controls our electrical demand very well and at a lower cost with quicker delivery than other companies have in the past."
Doug Smith, Project Engineer, Rochester Metal Products

"We have achieved the forecasted savings and payback as predicted. We are especially pleased with the ease of resetting control parameters to balance production requirements and savings."
Kim Hutchinson, Project Manager, Hitchiner Manufacturing

"We are now looking beyond furnace operations to see where the system will allow us to reduce our energy costs even more."
Jerry Dale, Plant Manager, Foote Foundry


General Manufacturing

"There has been no impact whatsoever on operations or product quality, and our savings are about $65k a year."
Larry Benanti, Director of Engineering, San Jose Mercury News

"We are more than satisfied with the technology. The system is exceeding our expectations."
Philip Linssen, Owner, San Diego Ice Arena

"There’s no negative impact on production. Over the course of a week, we can respond two times and still stay on target for production."
Chad Bentley, Manager of Manufacturing Tech., Trojan Battery